NRN

Investments

Hydropower

Puwa Khola One Hydropower Project

Puwa Khola-One Hydropower Limited was founded on the 16th day of Poush in the year 2065 B.S. with the primary objective of developing Hydropower Projects. The company has successfully commissioned a 4MW Hydropower plant in the Ilam District on the 23rd day of Ashoj in the year 2074 BS.

Middle Mewa Hydropower Project (73.50MW)

Middle Mewa Hydropower Project is a Peaking run-of-river type located between 1452m and 980m above mean sea level in the middle reach of Mewa Khola in Taplejung District, Province 1 of Nepal. The headworks is proposed in Temba and the powerhouse is located at Libang of Mikhwa Khola Rural Municipality along the left bank of the Mewa River. The overall progress of the project as of Jestha End 2082 is 80.10%. The project is in pipeline of SEBON for secondary market listing.

Jum Khola Jalvidhyut Aayojana (56MW)

Jum Khola Jalvidhyut Aayojana (56 MW) is a Run-of-River (RoR) type hydroelectric project being developed by Sanima Jum Hydropower Limited (SJHL). The Project is located in

 

Dolakha district of Bagmati Province and utilizes the flow from Jum River.